Date
1995
Location
Kıraç, İstanbul
Category
Kâğıt-Suni Deri-Ayakkabı

Project Description

2 × 2,500,000 kcal/h hot oil boilers (electrical panel design, installation and commissioning).

Electrical panel manufacturing and installation for chiller units.

Electrical panel manufacturing, installation and commissioning for a polyurethane slipper sole press (60 stations).

Complete electrical installation and commissioning of 2 synthetic leather and flock lines.

Electrical installation and commissioning of auxiliary machine groups (ISOTEX 4-head synthetic leather line, installation and commissioning — PRIMEC embossing, printing and sanding machines).

Hot oil plant panel, site installation and commissioning.